Resources · Coverage explained

Scheduling your equipment: why the number from 2019 will cost you in a claim

Coverage explained·8 min read

The honest answer is that your equipment policy pays the number on the schedule, not the number on the auction sheet. If the 84” Bomag went on the policy in 2019 at what you paid for it used, that’s what the carrier is working from the day it slides off a wet cut. Nobody calls you when a machine’s replacement cost moves. The schedule just sits there, getting quietly wrong, until the claim finds it. Here’s how the contractor’s equipment policy decides what it owes, where the old number bites, and what to do about it before renewal.

The schedule is the contract

A contractor’s equipment policy (inland marine, if you want the form name) insures your own iron: theft, rollover, fire, transit. The part most contractors skip past is that it insures each machine at a value you told the agent, on a day you probably don’t remember.

That value does two jobs. It sets the most the carrier typically pays for that machine, and it sets the premium. Those two jobs pull against each other, which is why schedules drift low. A lower number was cheaper in 2019 and it still is. It just stopped being enough.

Two things to keep separate in your head: how the machine is listed, and how the loss is settled. Both are decisions, and both are on the dec page.

Scheduled vs blanket

Scheduled means the machine is on the policy by make, model, serial number, and a dollar value. A mid-size excavator, a John Deere 772GP grader, the Bell haul truck. Each one has its own line and its own number.

Blanket means one total limit for a class of equipment, with a per-item cap underneath it. Small tools, attachments, a laser, the plate compactor. You don’t list each one. You buy a pool of money and the form caps what any single item can draw from it.

Blanket is simpler. That’s its whole appeal, and for the stuff in the back of the truck it’s the right tool. The problem starts when someone tries to run a $180,000 excavator through a blanket with a $25,000 per-item cap because it was easier than filling out the schedule. The carrier pays the cap. The rest is yours.

Scheduled means paperwork every time you buy or sell. It also means a machine you forgot to add is typically a machine that is not covered, which is a common finding in a policy review. Scheduled is still the right answer for the big iron. The middle ground most dirt outfits land on is scheduling everything over a threshold and running a blanket for what’s under it.

Replacement cost vs actual cash value

This is the second decision, and it’s the one that turns a 2019 number into a real problem.

Replacement cost pays what it costs to buy a comparable machine today, typically up to the scheduled value. Actual cash value (ACV) pays what the old machine was worth the moment before the loss, depreciation taken out.

On a two-year-old skid steer the gap is small. On a ten-year-old dozer with 6,000 hours it’s the difference between a machine and a down payment. And here’s the part that catches people: ACV settlement with a low schedule is two haircuts on the same claim. The carrier depreciates the machine, then caps the result at the scheduled value if the depreciated number is somehow higher. You get the smaller of two numbers that were both wrong.

Replacement cost costs more. On anything you rely on daily, we usually think it’s worth it. The policy language controls how each is calculated, so read the settlement clause on your form rather than assuming.

The 84” Bomag, then and now

Say you bought an 84” Bomag roller used in 2019 and scheduled it at what you paid, call it $45,000. It goes on the policy and never comes off. Seven years later it’s the machine you compact every driveway base with above 9,000 feet, and a comparable roller today runs closer to $70,000 on the used market.

Now it slides off a saturated cut near Fairplay during spring runoff and lands on its side in the ditch. The frame is bent. Total loss.

  • Scheduled at $45,000 with replacement cost: the carrier typically pays up to $45,000. You fund the other $25,000 or buy a smaller roller.
  • Scheduled at $45,000 with ACV: the carrier figures what a seven-year-old Bomag was worth before it rolled, which may be well under $45,000, and pays that.
  • Scheduled at $70,000 with replacement cost: you get a comparable roller. That’s what the policy was for.

The premium difference between the first line and the third is real. It’s also small next to $25,000 out of pocket in a week you can’t compact anything.

The Bell truck and the coinsurance clause

The Bell articulated haul truck is the machine on most schedules that’s furthest from its number. It’s expensive, it doesn’t get replaced often, and it never leaves the job, so nobody thinks about it the way they think about the trucks with plates.

It’s also where coinsurance shows up. Many contractor’s equipment forms carry a coinsurance clause, commonly at a high percentage of value. In plain English: you agree to insure the machine for at least that share of what it’s actually worth, and if you don’t, the carrier reduces the payment on a partial loss by the same proportion you were under.

Here’s the math. The Bell truck is scheduled at $150,000. Its actual replacement value has drifted to $250,000. The form says you have to carry at least 90 percent of value, so $225,000. You’re carrying $150,000, which is two-thirds of what you should be. A transmission fire does $60,000 of damage. The carrier, under a coinsurance clause, pays about two-thirds of $60,000, less the deductible. Call it $40,000 toward a $60,000 repair, on a machine that wasn’t a total loss.

That’s the part people don’t expect. Underinsuring doesn’t just cap the total loss. It shaves every partial loss too. Whether your form has a coinsurance clause, and at what percentage, is on the dec page or in the form itself, and it’s worth ten minutes to find out.

The three-quarter-ton on the highway has none of this. Auto physical damage on the commercial auto policy settles differently and doesn’t carry a schedule value the same way. Which is one more reason to know which policy each machine is on before the claim decides for you.

What moved since 2019

Used equipment prices. Freight. Attachment costs. Lead times on new machines, which pushed used prices up further. A grading and site prep outfit that scheduled its fleet in 2019 and renewed on autopilot is, in our experience, carrying schedules that are a meaningful fraction under what the fleet would cost to put back together. That is not a knock on anyone. Nobody sends a letter when a used excavator gets more expensive.

What we can’t tell you is the exact number for your machine. Dealer quotes, auction results, and the carrier’s own valuation guides don’t agree with each other, and the right number for a 2016 excavator with 4,000 hours in Park County is a judgment. What we can tell you is which of the three sources the carrier will use at claim time, so you can schedule to that one.

Read your own schedule this week

Pull the equipment schedule off the dec page. It’s usually a list with make, model, serial, and a value. Then do four things.

  1. Cross it against the yard. Anything sold comes off. Anything bought goes on. The trailer the excavator rides on is probably on the auto policy, so check it there.
  2. Put a today number next to every line over about $25,000. A dealer quote, a recent auction, or a rental yard’s replacement value. Circle every line where the schedule is more than a little under.
  3. Find the settlement basis. Replacement cost or ACV. It may be per item or for the whole schedule.
  4. Find the coinsurance clause, if the form has one. Note the percentage.

If steps two through four turn up anything you didn’t expect, that’s the phone call. It costs you ten minutes, and it’s a good deal easier than the theft claim or the dump truck question that tends to find the same bad schedule.

Where to go from here

Send us the dec page and the schedule. A policy review starts with the equipment list, because it’s where the biggest dollar gap usually hides, and marking it up against today’s numbers is where we start. The excavation insurance hub covers how the equipment policy fits with the rest of the stack.

Serving businesses located in Colorado. Coverage is determined by the policy language and the carrier.

FAQ

Questions contractors ask us

More questions, answered

What does it mean to schedule a piece of equipment?
Scheduling means the machine is listed on the policy by make, model, serial number, and a dollar value you chose. That value is typically the most the carrier pays for it. A blanket limit is one pool of money for a class of equipment (small tools, attachments) with a per-item cap. Big iron gets scheduled. The contractor's equipment page walks through both.
What happens if my excavator is scheduled for less than it's worth?
Two things, depending on the form. At best the carrier pays the scheduled value and you fund the rest of the replacement. At worst the policy carries a coinsurance clause, and underinsuring the machine cuts the payment on a partial loss too, not just a total one. Either way the fix is a phone call before the claim, not after.
Replacement cost or actual cash value on a used dozer?
Replacement cost pays what a comparable machine costs today. Actual cash value pays what the old one was worth, depreciation taken out. On a machine you rely on daily we usually think replacement cost is worth the higher premium, because the gap on a ten-year-old dozer can be the difference between a machine and a down payment. The policy language controls how each is figured.
How often should I update my equipment schedule?
Every time you buy, sell, or trade a machine, the same week. Then once a year at renewal, with a dealer's number or a recent auction result for anything over about $25,000. Prices on used iron moved a long way since 2019 and most schedules didn't move with them.
Is my Bell haul truck on the auto policy or the equipment policy?
Typically the equipment policy. An articulated haul truck has no plate and doesn't run on public roads, so it's insured as contractor's equipment, not as a vehicle. The Mack that hauls on the highway is on commercial auto. Where a machine lands decides which schedule it has to be on, and which one has the value problem.

Send us what you've got. We'll tell you what it's missing.

Upload your dec pages. We read them the way we read our own: equipment schedule first, then auto, then what the contracts ask for.

(720) 529-0300

Serving businesses located in Colorado.