Resources · Contracts and COIs
Bonds are not insurance. Public work needs both.
The honest answer is that a bond is a loan you hope never gets called, and insurance is a bet the carrier hopes never pays. They are not the same thing. They don’t do the same job on a public project, and the permit desk in Aurora that asks for both is not being redundant. A bond pays the city or the owner when you don’t perform, and the surety comes to you for every dollar. Insurance pays the claim when your Mack dump truck or your trench hurts someone, and the carrier doesn’t send you the bill. Public work needs both, in a specific order, and the bonds page covers the types. This article covers why they’re different and what that difference costs you the day something goes wrong.
Two parties versus three
Insurance has two parties. You and the carrier. You pay a premium, the carrier takes the risk of covered claims, and when it pays one it doesn’t come back to you for reimbursement. That’s the whole point. The risk moved.
A bond has three. The principal (you), the obligee (the city, the county, CDOT, the school district, the owner), and the surety, which backs your promise to the obligee. If you don’t finish the road regrade, don’t pay your aggregate supplier, or don’t restore the curb you cut, the obligee makes a claim on the bond, the surety pays or hires someone to finish, and then the surety turns to you. The risk never moved. The surety vouched for you, and you owe it back.
That’s why sureties underwrite like a bank. Financial statements, work in progress, your credit, and a document called the general indemnity agreement, which is the part most contractors sign without reading.
The indemnity agreement
Before a surety writes a bond, you sign a general indemnity agreement. It says that if the surety pays anything on any bond it has written for you, you repay it in full, plus its costs and its attorneys. It typically binds the business and the owners personally, and on a small outfit it commonly asks for spouses to sign so the surety can reach personal assets. Some agreements let the surety demand collateral the moment a claim looks likely, before it has paid a dime.
Read it once, slowly, before the first bond. It’s the document that makes the bond credit instead of insurance, and it doesn’t get less binding because the bond was small.
The bond family, in the order you meet them
License and permit bonds come first, because they come with the right-of-way permit. Three Colorado examples, each stated by the agency that requires it:
Aurora's Public Improvement Permit for work in the right-of-way requires a $20,000 surety/warranty bond payable to the City, valid two years from issue, and general liability insurance of at least $400,000 per occurrence for bodily injury or death and $100,000 per occurrence for property damage, plus an approved traffic control plan for any work restricting access to the right-of-way. (City of Aurora Public Improvement Permit application (Public Works)) Douglas County requires a permit for any construction or installation within the public right-of-way, a non-cancelable permit bond equal to the cost of the public improvements but not less than $20,000 per permit, and liability insurance of not less than $400,000 each for property damage, public liability, and bodily injury naming the County. (Douglas County Roadway Design and Construction Standards, Chapter 10 (Permit Procedures and Bonding Requirements)) Before excavating in a Pueblo County right-of-way, the excavator must obtain a county permit (Pueblo County Code 12.08.050(A)) and post a $10,000 license and permit bond plus evidence of commercial general liability insurance with a $1,000,000 general aggregate (12.08.040). (Pueblo County Code 12.08.040(A), (B); 12.08.050(A))Read what’s next to the bond in each one: a liability insurance requirement. Aurora, Douglas County, and Pueblo County all put the bond and the insurance on the same permit form, because they’re asking two different questions. Will the street get restored (bond)? And who pays if your excavator drops the curb on a parked car (insurance)? Grand Junction puts it a little differently, with a performance and warranty piece attached to the application and no dollar figure on the page.
Grand Junction requires a permit for any work within the city's public right-of-way, and in most cases a performance/warranty guarantee, a traffic control plan from a professional traffic control company, and a location map must accompany the application; the permit page states no dollar amounts. (City of Grand Junction, Permit for Construction Within Public Right-of-Way)Bid bonds come with a public bid. They promise the agency that if your number wins, you’ll sign the contract and post the other bonds. Small, cheap, and a real commitment: walk away from a winning bid and the bid bond typically pays the difference between your number and the next one, up to its penal sum.
Performance bonds come with the award. They back your promise to finish the job per the contract, and on public work they’re typically written for the full contract amount. If you don’t finish, the surety finishes it or pays the agency to, and then reads you the indemnity agreement.
Payment bonds come with the same award. They back your promise to pay your subs and suppliers. On public work this one matters more than it looks, because a supplier generally can’t put a mechanic’s lien on public property the way it can on a private lot; the payment bond is typically what stands behind the invoice for the pit run. Your aggregate supplier will ask about it.
Maintenance bonds sometimes follow completion, backing the work for a stated period.
Public agencies in Colorado commonly require performance and payment bonds on construction contracts above a dollar threshold set by statute or by the agency. The bid documents will tell you which bonds apply and the current figure, and that’s the place to get it, not an article.
What the insurance does on the same job
Everything the bond doesn’t. The same Aurora permit that wants the bond wants liability limits, and a GC or agency contract wants more of them. On a county road regrade with a Bell truck and a 772GP working the shoulder in a plains wind:
- A car hits the truck at the flagger station. Commercial auto. Not the bond.
- The grader clips a fiber line the locate missed. General liability, depending on the form and the locate ticket. Not the bond.
- The Bell truck is stolen from the staging area. Contractor’s equipment. Not the bond.
- The regrade is finished three months late and the county hires someone to finish. The performance bond, and then you.
The GC exhibit article reads the insurance side of a public contract the same way it reads a private one, and the additional insured article explains why the agency wants to be on your policy, not just on your certificate. CDOT’s right-of-way permits show both asks in one place.
CDOT utility and special-use permits for work in state highway right-of-way require commercial general liability of $1,000,000 per occurrence and $2,000,000 aggregate and $1,000,000 auto liability, with CDOT named as additional insured and certificates furnished before work starts; access-permit projects may also require a performance bond. (CDOT Form 1233 (Utility Permit) and Form 1283 (Special Use Permit); 2 CCR 601-18 § 2.2.2) [VERIFY]The CDOT figures are still being confirmed against the current permit form, so read them as the shape of the ask. The shape is the point: insurance limits, additional insured status, and, on access permits, a performance bond, all before the first cut.
The day it goes wrong, twice
Two scenarios, same job, to make the line clear.
Scenario one. Your dump truck sideswipes a car on Smoky Hill Road on the way to the Aurora site. The driver is hurt. Your commercial auto pays the claim up to its limit, the umbrella above that if you have one, and neither carrier asks you for the money back. That’s insurance doing its job. The umbrella article covers what happens when the auto limit isn’t enough.
Scenario two. Halfway through the same project your biggest private customer stops paying, your cash goes thin, and you can’t make payroll to finish the Aurora work. The city declares default and calls the performance bond. The surety hires another contractor to finish. Then it sends you the invoice, plus its costs, and the indemnity agreement you signed says you pay it. Your GL, your auto, your umbrella: none of them respond, because nobody was hurt and nothing was damaged. You didn’t perform. That’s not a covered loss. That’s a debt.
Both scenarios are real. Only one of them has a policy behind it.
Capacity, as a concept
Sureties give you a line, the way a bank does: a single-bond limit and an aggregate limit for all open bonded work. The line grows with your financial statements and your history of finishing bonded jobs. It shrinks when your balance sheet does. A first-time bidder on a real performance bond with no surety relationship is asking for credit from someone who has never seen the books. Sometimes a credit-score program will write a small bond quickly. It won’t carry a real contract. What we don’t control is how much capacity a given surety extends, or how fast. That’s the surety’s underwriting, and it starts with your CPA.
| Question | Bond | Insurance |
|---|---|---|
| Who gets paid | The obligee (city, owner, supplier) | The injured party, or you, depending on the line |
| Who pays it back | You, under the indemnity agreement | Nobody; the carrier took the risk |
| What triggers it | You don’t perform, don’t pay, don’t restore | An accident, a theft, a storm, an injury |
| How it’s underwritten | Like credit: financials, work in progress, personal indemnity | Like risk: class, payroll, vehicles, loss history |
| What limits it | The penal sum of the bond and your surety line | The policy limit and the exclusions |
| Who asks for it | The permit desk, the bid package, the contract | The same permit desk, bid package, and contract |
The order you need them in
For a public bid, the sequence usually runs: surety relationship first, bid bond with the bid, insurance certificates and performance and payment bonds at award, permit bond and insurance certificate at the right-of-way desk, and additional insured endorsements on the policies before the certificate can truthfully say so. Getting the bond and the certificate in the same week is possible when the policy already carries the endorsements the agency wants and the surety already has your file. It isn’t possible from a standing start. Dump truck and aggregate haulers and other excavation contractors feeding a public job usually see the payment bond question from the other side, as the supplier asking whether it exists.
Where to go from here
If a permit desk in Aurora or Douglas County just asked for a bond and a certificate together, the certificates page covers the insurance half and tells you what to paste from the permit form. If you’re headed for your first bid on public work, Get Insured starts with the bid package, because the insurance has to satisfy the agency’s exhibit and the bond has to fit the surety line at the same time. Contractors working Grand Junction or Pueblo will find each permit desk asks the question its own way.
Serving businesses located in Colorado. Coverage is determined by the policy language and the carrier.
What is the difference between a bond and insurance?
Which bonds does public work in Colorado usually require?
Does a performance bond cover injuries or property damage on the job?
What is a general indemnity agreement?
Sources
- IRMI, Surety Bond (definition) (accessed 2026-09-03)
- IRMI, Performance Bond (definition) (accessed 2026-09-03)
- City of Aurora, Public Improvement Permit application (Public Works) (accessed 2026-09-03)
- Douglas County Roadway Design and Construction Standards, Chapter 10 (Permit Procedures and Bonding Requirements) (accessed 2026-09-03)
- City of Grand Junction, Permit for Construction Within Public Right-of-Way (accessed 2026-09-03)
- Pueblo County Code, Chapter 12.08, Excavations (accessed 2026-09-03)
- 2 CCR 601-18, CDOT Utility Accommodation Code (insurance requirements for work in state right-of-way) (accessed 2026-09-03)
Related articles
Read next
- Contracts and COIs · 9 min read
How to read a GC's insurance requirements without a lawyer
A GC insurance exhibit, clause by clause: limits, additional insured forms, primary and non-contributory, waiver of subrogation, umbrella, and notice. Read the article - Contracts and COIs · 8 min read
Additional insured vs certificate holder: the two-paragraph version
A certificate holder gets a piece of paper. An additional insured gets a piece of your policy. The two-paragraph version, then what goes wrong at claim time. Read the article - Coverage explained · 9 min read
Umbrella: when $1M/$2M stops being enough
Two ways a $1M/$2M GL runs out: one bad occurrence, or a year of additional insured tenders eating the aggregate. What an umbrella does and how to size it. Read the article - Coverage explained · 8 min read
Builders risk vs installation floater: which one covers the pallet of pavers
Three pallets of wall block on a Castle Rock lot over the weekend. Builders risk insures the structure. The installation floater insures your materials. Read the article
Statutes and numbers on this page last verified September 2, 2026 by a licensed Colorado producer. How we verify.